We have successfully completed another design & build project for Lego, the world’s third largest manufacturer of play materials.

Retail – Fit Out

Using a variety of Mitsubishi Electric equipment, systems consisted of replace technology, ducted VRF fan coils, twin split and water cooled VRF systems. Projects were installed & commissioned typically within a 4 week period.

Results:

It was critical that the projects were delivered within the strict 4 week time frame, within budget of £25,000 and met the environmental requirements of each building.