Case Study

The Gym

  • Client: The Gym, Brighton
  • Project Value: £94,750
  • Programme: 12 Weeks
  • Project Type: Design and Build

A high quality gym space with a modern look, set within a prestigious building situated on the promenade and looking out to sea. This project consisted of a full installation of mechanical, ventilation, air conditioning and associated controls. All air conditioning and ductwork services were designed by our in-house design team.

The project design was based around the unique location of the premises and the challenges it presented. Airtemp successfully delivered on a strict project completion time frame of 12 weeks.